If your facility already has an overhead crane, you’re sitting on an untapped efficiency goldmine. Pairing your crane with telescopic cantilever racks can transform your material handling from a 15-minute ordeal into a 2-minute operation.
Most warehouses with overhead cranes still use conventional cantilever racks. The workflow looks like this:
This double-handling wastes time, requires both a forklift operator AND a crane operator, and creates safety risks at the handoff point.
With telescopic cantilever racks, the workflow becomes:
One step eliminated. One operator eliminated. One safety risk eliminated.
| Metric | Before (Conventional) | After (Telescopic) |
|---|---|---|
| Retrieval time | 12-15 minutes | 1.5-2 minutes |
| Operators needed | 2 (forklift + crane) | 1 (crane only) |
| Aisle width | 3.5-4.5 meters | 1.5-2 meters |
| Storage density | Baseline | +50% capacity |
| Forklift damage risk | High | Zero |
TC Series (Welded) — For bridge cranes handling 3-5 ton loads. All-welded construction for maximum rigidity. Ideal for steel plates, heavy pipes, and structural steel.
TE Series (Assembled) — For lighter cranes handling 1-3 ton loads. Bolt-assembled with adjustable arm spacing. Perfect for sheet materials, wood panels, and mixed inventory.
Have an overhead crane? Let’s optimize your storage.