Tcrack Real-World Case Studies

Standardized “Problem → Solution → Results” Cases Based on Actual Projects

📋 Case 1: Ultimate Storage for 12m Extra-Long Heavy Pipes

❌ Customer Pain Points

  • Need to store both 12m long and 3m long pipes
  • Load per level: 6 tons
  • 12m pipes prone to sagging and deformation
  • Must accommodate short material storage
  • Upper-level operations difficult and dangerous

✅ Tcrack Solution

  • 8-column structure effectively prevents 12m material sagging
  • Multi-column support ensures storage stability
  • Independent drawer design enables random access to any level
  • Chain drive system solves upper-level operation challenges
  • Long and short materials stored on separate levels without interference
8-column extra-long material storage

▲ Multi-column (8-column) heavy-duty telescopic rack designed specifically for storing 12m+ extra-long materials

📋 Case 2: Maximizing Export Container Space

Container loading Forklift loading

❌ Customer Pain Points

  • Overseas customer, extremely sensitive to shipping costs
  • Required single arm depth of 1.5m, total width exceeding 2.4m
  • Standard TC Rack welded width exceeds container door width (2.34m)
  • Expensive open-top containers not cost-effective

✅ TE Series Solution

  • Adopted TE Series fully knock-down design
  • All components completely disassembled for packing
  • Easily fits into standard 40ft high-cube containers
  • Compact packaging prevents transit scratches
  • Shipping costs reduced by 30–50%

This is a classic example of the TE Series “design for logistics” approach. Through fully knock-down construction, the international shipping challenge for oversized racks is completely solved without sacrificing any performance.

Facing Similar Storage Challenges?

Tell us your specific requirements and we will design a custom Tcrack solution for you